IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 3291 Abrasive Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0365 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
WI0365 # 06 Y:2000 06 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,168 $7,500 Implemented
WI0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $600 Implemented
UM0144 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,661 $110 Implemented
UM0144 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $1,000 Implemented
UM0144 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $350 Implemented
UM0144 # 04 Y:1999 04 1999 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,837 $9,350 Not Implemented
UM0144 # 05 Y:1999 05 1999 USE OPTIMUM THICKNESS INSULATION $1,848 $2,100 Not Implemented
UM0144 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $29,091 $5,000 Implemented
UM0144 # 07 Y:1999 07 1999 $7,680 $584 Implemented
OD0071 # 01 Y:1996 01 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $916 $2,250 Not Implemented
OD0071 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,249 $1,495 Implemented
OD0071 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $500 Implemented
OD0071 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,052 $7,879 Implemented
OD0071 # 05 Y:1996 05 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,874 $40,000 Not Implemented
OD0010 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,348 $3,873 Implemented
OD0010 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $965 $800 Implemented
OD0010 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $25 Implemented
OD0010 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $927 $7,684 Implemented
OD0010 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $187 Implemented
KU0421 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,665 $29,052 Not Implemented
KU0421 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,556 $19,846 Implemented
KU0421 # 03 Y:1994 03 1994 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $1,509 $1,200 Not Implemented
KU0421 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $996 $580 Not Implemented
KU0421 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $484 $366 Not Implemented