IAC Assessment: OD0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Coated Abrasives
NAICS n/a
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 45,400
Annual Production 13,500,000 Thousand Feet
Production Hrs. Annual 2,080
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,174 696,659 kWh $0.05
Electricity Demand $15,583 3,322 kW-months/year $4.69
Electricity Fees $5,553 - $ -
Natural Gas $27,899 5,738 MMBtu $4.86
TOTAL ENERGY COSTS $107,104
RECOMMENDED SAVINGS* $76,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,529
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$916
Cost:
$2,250
- - - - $916 189 - - -
-
kWh
-
-
kW-months/year
$916
189
MMBtu
-
-
lb
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,249
Cost:
$1,495
- - - - $2,249 501 - - -
-
kWh
-
-
kW-months/year
$2,249
501
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$228
Cost:
$500
$174 3,224 $54 12 - - - - $174
3,224
kWh
$54
12
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,052
Cost:
$7,879
$2,035 38,101 $1,017 217 - - - - $2,035
38,101
kWh
$1,017
217
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$69,874
Cost:
$40,000
- - - - - - $69,874 225,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$69,874
225,600
lb
TOTAL RECOMMENDED Savings:
$76,319
Cost:
$52,124
$2,209 41,325 $1,071 229 $3,165 690 $69,874 225,600 $2,209
41,325
kWh
$1,071
229
kW-months/year
$3,165
690
MMBtu
$69,874
225,600
lb
TOTAL IMPLEMENTED Savings:
$5,529
Cost:
$9,874
$2,209 41,325 $1,071 229 $2,249 501 - - $2,209
41,325
kWh
$1,071
229
kW-months/year
$2,249
501
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)