IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

265

matching recommendations
Reset
SIC 3296 Mineral Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0362 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $224 Not Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented
WV0362 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $0 Implemented
WV0362 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,693 $1,500 Implemented
WV0362 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,851 $185 Implemented
WV0362 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $978 Implemented
WV0362 # 09 Y:2007 09 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,851 $1,000 Implemented
AS0429 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,688 $1,000 n/a
AS0429 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,039 $500 n/a
AS0429 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,127 $1,000 n/a
AS0429 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $34 $3,200 n/a
AS0428 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $475 $4,000 n/a
AS0428 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $614 $300 n/a
AS0428 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,252 $1,500 n/a
AS0428 # 04 Y:2006 04 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,269 $5,600 n/a
AS0428 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,918 $2,500 n/a
AS0428 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,791 $1,000 n/a
AS0428 # 01 Y:2006 01 2006 $15,000 $0 n/a
AS0428 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $5,000 n/a
MS0219 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,971 $696 Implemented
MS0219 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $425,529 $1,452,000 Not Implemented
MS0219 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $67,886 $1,950 Implemented
MS0219 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $44,270 $30,411 Not Implemented
MS0219 # 05 Y:2002 05 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $23,617 $1,500 Implemented
MS0219 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,779 $1,113 Implemented