IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
SIC 3297 Nonclay Refractories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0499 # 04 Y:2001 04 2001 USE MINIMUM SAFE OVEN VENTILATION $7,334 $14,200 Not Implemented
MA0499 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,936 $12,650 Not Implemented
MA0499 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,235 $255 Not Implemented
MA0499 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $2,000 Not Implemented
UM0180 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $750 Implemented
UM0180 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,120 $2,100 Implemented
UM0180 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,580 $950 Implemented
UM0180 # 04 Y:2001 04 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $54,000 $16,000 Implemented
GT0662 # 01 Y:1999 01 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,196 $3,800 Implemented
GT0662 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,317 $550 Implemented
GT0662 # 03 Y:1999 03 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $424,479 $250,000 Implemented
GT0662 # 04 Y:1999 04 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $16,138 $30,000 Not Implemented
GT0662 # 05 Y:1999 05 1999 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $68,343 $60,000 Implemented
GT0662 # 06 Y:1999 06 1999 RECOVER AND REUSE COOLING WATER $85,620 $30,000 Implemented
GT0662 # 07 Y:1999 07 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,775 $0 Not Implemented
GT0662 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $14,794 $0 Not Implemented
WI0307 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $24,171 $500 Implemented
WI0307 # 02 Y:1997 02 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $14,040 $0 Not Implemented
WI0307 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,884 $0 Not Implemented
WI0307 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $721 $0 Implemented
WI0307 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $640 Implemented
WI0307 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $331 $425 Implemented
WV0114 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $248 Implemented
WV0114 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,663 $11,400 Implemented
WV0114 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,379 $2,240 Implemented