IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 3299 Nonmetallic Mineral Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0110 # 01 Y:2001 01 2001 COMBINE UTILITY METERS $5,085 $0 Not Implemented
SU0110 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,180 $2,241 Not Implemented
SU0110 # 03 Y:2001 03 2001 MINIMIZE WATER USAGE $51,680 $1,605 Not Implemented
SU0110 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,023 $90 Not Implemented
SU0110 # 05 Y:2001 05 2001 DISCONNECT BALLASTS $65 $0 Not Implemented
SU0110 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $1,526 $3,780 Not Implemented
RU0088 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,114 $0 Not Implemented
RU0088 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,045 $68 Not Implemented
RU0088 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $650 Implemented
RU0088 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,127 $0 Not Implemented
RU0088 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $16,127 $800 Not Implemented
RU0088 # 06 Y:1990 06 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,585 $50,000 Not Implemented
RU0088 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,543 $0 Not Implemented
RU0088 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $265 $156 Not Implemented
RU0088 # 09 Y:1990 09 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,926 $13,500 Not Implemented