IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0625 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,463 $31,000 Not Implemented
MA0625 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,935 $8,000 Implemented
MA0625 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,861 $14,400 Not Implemented
MA0625 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,881 $0 Not Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented
UM0330 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $17,750 $12,000 Not Implemented
UM0330 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,366 $5,250 Not Implemented
UM0330 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $1,775 $516 Not Implemented
UM0330 # 04 Y:2007 04 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,732 $1,300 Not Implemented
UM0330 # 05 Y:2007 05 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,605 $500 Not Implemented
UM0330 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,228 $4,500 Not Implemented
UM0330 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $1,500 Not Implemented
UM0330 # 08 Y:2007 08 2007 COVER OPEN TANKS $733 $1,000 Not Implemented
UM0329 # 01 Y:2007 01 2007 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $154,115 $300,000 Not Implemented
UM0329 # 02 Y:2007 02 2007 COVER OPEN TANKS $115,389 $140,000 Implemented
UM0329 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,880 $39,375 Implemented
UM0329 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,784 $265,000 Not Implemented
UM0329 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,455 $6,300 Implemented
BD0333 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $1,570 $901 Implemented
BD0333 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $476 Implemented
BD0333 # 03 Y:2007 03 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $36,206 $15,001 Not Implemented
BD0333 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $73,372 $30,001 Not Implemented
BD0333 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $67,989 $35,001 Not Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented