Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,364
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0625 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,463 | $31,000 | Not Implemented |
MA0625 # 02 Y:2007 | 02 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,935 | $8,000 | Implemented |
MA0625 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,861 | $14,400 | Not Implemented |
MA0625 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,881 | $0 | Not Implemented |
MA0625 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,964 | $10,530 | Implemented |
UM0330 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,750 | $12,000 | Not Implemented |
UM0330 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,366 | $5,250 | Not Implemented |
UM0330 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $1,775 | $516 | Not Implemented |
UM0330 # 04 Y:2007 | 04 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,732 | $1,300 | Not Implemented |
UM0330 # 05 Y:2007 | 05 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,605 | $500 | Not Implemented |
UM0330 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,228 | $4,500 | Not Implemented |
UM0330 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,500 | Not Implemented |
UM0330 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $733 | $1,000 | Not Implemented |
UM0329 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $154,115 | $300,000 | Not Implemented |
UM0329 # 02 Y:2007 | 02 | 2007 | COVER OPEN TANKS | $115,389 | $140,000 | Implemented |
UM0329 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $74,880 | $39,375 | Implemented |
UM0329 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,784 | $265,000 | Not Implemented |
UM0329 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,455 | $6,300 | Implemented |
BD0333 # 01 Y:2007 | 01 | 2007 | INSTALL OCCUPANCY SENSORS | $1,570 | $901 | Implemented |
BD0333 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $376 | $476 | Implemented |
BD0333 # 03 Y:2007 | 03 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $36,206 | $15,001 | Not Implemented |
BD0333 # 04 Y:2007 | 04 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $73,372 | $30,001 | Not Implemented |
BD0333 # 05 Y:2007 | 05 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $67,989 | $35,001 | Not Implemented |
BD0333 # 06 Y:2007 | 06 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $819 | $526 | Implemented |
BD0333 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $378 | $2 | Implemented |