IAC Assessment: IA0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2008
Principal Product Aluminium Die Cast Parts
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 74,000
Annual Production 3,600,000 Pounds
Production Hrs. Annual 8,232
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,324 5,844,714 kWh $0.05
Electricity Demand $94,677 11,496 kW-months/year $8.24
Electricity Fees $15,296 - $ -
Natural Gas $315,104 37,431 MMBtu $8.42
TOTAL ENERGY COSTS $707,401
RECOMMENDED SAVINGS* $30,108 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,577
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,946
Cost:
$660
$3,288 68,181 $658 110 - - $3,288
68,181
kWh
$658
110
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,525
Cost:
$15
$1,250 25,931 $275 42 - - $1,250
25,931
kWh
$275
42
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,191
Cost:
$300
$5,166 107,181 $1,025 156 - - $5,166
107,181
kWh
$1,025
156
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,842
Cost:
$2,300
- - - - $1,842 223 -
-
kWh
-
-
kW-months/year
$1,842
223
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,261
Cost:
$305
$2,261 46,922 - - - - $2,261
46,922
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,865
Cost:
$6,165
$3,888 80,674 $1,542 235 $1,435 174 $3,888
80,674
kWh
$1,542
235
kW-months/year
$1,435
174
MMBtu
07: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$1,379
Cost:
$350
- - - - $1,379 167 -
-
kWh
-
-
kW-months/year
$1,379
167
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,350
Cost:
-
$1,127 25,555 $223 32 - - $1,127
25,555
kWh
$223
32
kW-months/year
-
-
MMBtu
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$474
Cost:
$143
$422 8,759 $52 12 - - $422
8,759
kWh
$52
12
kW-months/year
-
-
MMBtu
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,310
Cost:
$1,155
$1,310 27,185 - - - - $1,310
27,185
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$664
Cost:
$250
- - - - $664 71 -
-
kWh
-
-
kW-months/year
$664
71
MMBtu
12: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,301
Cost:
-
$1,920 39,842 $381 57 - - $1,920
39,842
kWh
$381
57
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,108
Cost:
$11,643
$20,632 430,230 $4,156 644 $5,320 635 $20,632
430,230
kWh
$4,156
644
kW-months/year
$5,320
635
MMBtu
TOTAL IMPLEMENTED Savings:
$25,577
Cost:
$7,838
$19,322 403,045 $4,156 644 $2,099 245 $19,322
403,045
kWh
$4,156
644
kW-months/year
$2,099
245
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas