Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0319 # 07 Y:2021 07 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $22,855 $145,659 Not Implemented
MZ0319 # 03 Y:2021 03 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,002 $600 Implemented
MZ0319 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,278 $240 Implemented
MZ0281 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $22,302 $48,220 Not Implemented
MZ0281 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,486 $720 Not Implemented
MZ0281 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $98 $250 Not Implemented
MZ0281 # 02 Y:2020 02 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $1,877 $396 Not Implemented
MZ0269 # 03 Y:2019 03 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $17,310 $10,400 Not Implemented
MZ0269 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,409 $250 Implemented
MZ0269 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,423 $6,600 Implemented
MZ0254 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,370 $57,615 Implemented
MZ0254 # 02 Y:2018 02 2018 USE OPTIMUM THICKNESS INSULATION $49,702 $20,960 Implemented
MZ0254 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,434 $10,000 Implemented
MZ0254 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $384 $1,000 Implemented
MZ0254 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,499 $52,000 Implemented
MZ0254 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,856 $10,840 Implemented
MZ0254 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,653 $180 Implemented
MZ0224 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $355 $300 Not Implemented
MZ0224 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,705 $1,263 Implemented
MZ0224 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $305 $700 Not Implemented
MZ0224 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $474 $663 Implemented
MZ0224 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,978 $2,200 Implemented
MZ0193 # 01 Y:2015 01 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,804 $700 Implemented
MZ0193 # 03 Y:2015 03 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,777 $37,500 Implemented
MZ0193 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,714 $1,160 Implemented