IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0157 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,141 $3,250 Not Implemented
OK0589 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,862 $1,900 Implemented
OK0589 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,942 Implemented
OK0589 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $504 $136 Implemented
OK0589 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,000 $230,000 Implemented
OK0589 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $20,274 $59,400 Implemented
UL0238 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,743 $0 Not Implemented
UL0238 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $12,291 $1,236 Implemented
UL0238 # 03 Y:2000 03 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $15,288 $80,000 Not Implemented
ND0343 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,009 $4,500 Not Implemented
ND0343 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,145 $400 Not Implemented
ND0343 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $507 $40 Not Implemented
ND0343 # 04 Y:2000 04 2000 DEVELOP A REPAIR/REPLACE POLICY $8,389 $43,959 Not Implemented
ND0343 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $11,327 $22,922 Not Implemented
ND0343 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $-3,501 $6,210 Not Implemented
ND0343 # 07 Y:2000 07 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,533 $250 Not Implemented
UD0585 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,793 $76,500 Not Implemented
UD0585 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,367 $32,550 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,563 $0 Not Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented
UD0585 # 06 Y:2000 06 2000 INSTALL SKYLIGHTS $3,390 $13,560 Not Implemented
UD0585 # 07 Y:2000 07 2000 USE PHOTOCELL CONTROLS $514 $120 Implemented
HO0216 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,337 $24,765 Not Implemented
HO0216 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $3,000 Not Implemented