Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0128 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,032 $0 Not Implemented
BD0128 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,539 $500 Not Implemented
BD0128 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $1,524 $600 Not Implemented
BD0128 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $1,231 $750 Not Implemented
BD0128 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $11,183 $8,000 Not Implemented
BD0128 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $996 $1,705 Not Implemented
BD0128 # 09 Y:1999 09 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,988 $500 Not Implemented
BD0128 # 10 Y:1999 10 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,800 $500 Not Implemented
UD0564 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $220,632 $300,000 Not Implemented
UD0564 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,972 $148 Implemented
UD0564 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,776 $49,660 Not Implemented
UD0564 # 04 Y:1999 04 1999 COVER OPEN TANKS $13,847 $2,400 Implemented
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 06 Y:1999 06 1999 METER WASTE WATER $5,686 $2,200 Not Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $5,096 Not Implemented
UD0564 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $684 Not Implemented
UD0563 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $29,762 $4,400 Not Implemented
UD0563 # 02 Y:1999 02 1999 ELIMINATE/REDUCE AN OPERATION $30,000 $6,648 Not Implemented
UD0563 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,365 $31,000 Implemented
UD0563 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,536 $3,000 Not Implemented
UD0563 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,707 $550 Not Implemented
UD0563 # 06 Y:1999 06 1999 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $13,484 $2,645 Not Implemented
UD0563 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $9,270 Implemented
UD0563 # 08 Y:1999 08 1999 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,880 $8,471 Not Implemented