IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,313

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0064 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,525 $1,000 n/a
UM0064 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $413 $2,025 n/a
UM0064 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,420 $852 n/a
MS0069 # 01 Y:1996 01 1996 USE SYNTHETIC LUBRICANT $1,743 $300 Not Implemented
MS0069 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,677 $2,740 Not Implemented
MS0069 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,360 $7,226 Not Implemented
MS0069 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,012 $925 Not Implemented
MS0069 # 05 Y:1996 05 1996 USE POWER DURING OFF-PEAK PERIODS $81,053 $0 Not Implemented
MS0069 # 06 Y:1996 06 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,080 $640 Not Implemented
UM0060 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,500 $1,607 Implemented
UM0060 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,561 $12,818 Not Implemented
UM0060 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $2,418 $6,182 Not Implemented
UM0060 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,807 $2,550 Implemented
UM0060 # 05 Y:1996 05 1996 TREAT AND REUSE RINSE WATERS $1,039 $1,000 Implemented
WI0281 # 01 Y:1996 01 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,184 $80,000 Not Implemented
WI0281 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,144 $12,950 Not Implemented
WI0281 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,250 $0 Not Implemented
WI0281 # 04 Y:1996 04 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,457 $15,000 Not Implemented
WI0281 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,051 $26,220 Not Implemented
WI0281 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,879 $0 Implemented
WI0281 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,899 $210 Implemented
WI0281 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $740 Not Implemented
WI0281 # 09 Y:1996 09 1996 INSTALL AUTOMATIC STACK DAMPER $931 $1,100 Not Implemented
WI0281 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,554 $701 Implemented
AR0099 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,044 $1,143 Implemented