IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,313

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0325 # 10 Y:1995 10 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $7,953 $5,526 Implemented
MA0322 # 01 Y:1995 01 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $62,376 $150,000 Not Implemented
MA0322 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $20,120 $1,500 Implemented
MA0322 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,158 $2,200 Implemented
MA0322 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,082 $17,946 Implemented
MA0322 # 05 Y:1995 05 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,750 $500 Not Implemented
MA0322 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $684 $578 Not Implemented
MA0322 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $384 $945 Implemented
MA0322 # 08 Y:1995 08 1995 USE OTHER WASTE CONCENTRATION METHODS $61,150 $85,000 Implemented
MA0322 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,494 $57,500 Not Implemented
DS0015 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,981 $4,356 Implemented
DS0015 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $590 $200 Implemented
DS0015 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,378 $744 Implemented
DS0015 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,343 $13,182 Implemented
DS0015 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $249 $257 Not Implemented
DS0015 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $50 $241 Not Implemented
WI0219 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $644 $782 Implemented
WI0219 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $744 $375 Not Implemented
WI0219 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,622 $0 Implemented
UL0114 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,207 $5,550 Not Implemented
UL0114 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,092 $4,157 Not Implemented
UL0114 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $2,000 Not Implemented
UL0114 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,440 $85 Implemented
UL0114 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $127,600 $190,000 Not Implemented
UL0114 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,370 Not Implemented