IAC logo
IAC Assessment: KG0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1995
Principal Product Steel Casting,Valves,Oil Industri Tools,Crane & Cable Parts
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 197,500
Annual Production 4,000 Tons
Production Hrs. Annual 2,750
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $897,772 15,792,790 kWh $0.06
Natural Gas $243,859 97,656 MMBtu $2.50
TOTAL ENERGY COSTS $1,141,631
RECOMMENDED SAVINGS* $45,655 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$26,990
Cost:
$5,000
- - $26,990 10,796 -
-
kWh
$26,990
10,796
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$10,625
Cost:
$2,500
- - $10,625 2,506 -
-
kWh
$10,625
2,506
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,597
Cost:
$17,060
$4,597 90,563 - - $4,597
90,563
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,788
Cost:
$767
$1,788 33,705 - - $1,788
33,705
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,330
Cost:
$2,480
$1,330 34,877 - - $1,330
34,877
kWh
-
-
MMBtu
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$325
Cost:
-
$325 24,912 - - $325
24,912
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,655
Cost:
$27,807
$8,040 184,057 $37,615 13,302 $8,040
184,057
kWh
$37,615
13,302
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas