IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0763 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,130 $20,000 Implemented
AM0763 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,525 $8,000 Not Implemented
AM0763 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,730 $42,230 Implemented
AM0763 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,500 $400 Not Implemented
AM0763 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,600 $37,900 Implemented
AM0763 # 09 Y:2018 09 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,640 $7,720 Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
UD0992 # 02 Y:2018 02 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $48,158 $1,000 Not Implemented
UD0992 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $30,337 $32,600 Not Implemented
UD0992 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,815 $0 Not Implemented
UD0992 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,174 $9,900 Not Implemented
SU0466 # 01 Y:2018 01 2018 ELIMINATE/REDUCE AN OPERATION $9,225 $1,173 Not Implemented
SU0466 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,326 $2,058 Implemented
SU0466 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $166,039 $203,490 Not Implemented
SU0466 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $876 Implemented
SU0466 # 05 Y:2018 05 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $111 $217 Not Implemented
SU0466 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,439 $44,602 Implemented
AS0458 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $229,273 $13,000 Implemented
AS0458 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $141,718 $198,093 Not Implemented
AS0458 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $108,000 $34,970 Not Implemented
AS0458 # 04 Y:2018 04 2018 USE SOLAR HEAT FOR HEAT $15,016 $6,034 Not Implemented
AS0458 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $14,020 $33,868 Not Implemented
AS0458 # 06 Y:2018 06 2018 RECOVER AND REUSE COOLING WATER $3,500 $2,576 Not Implemented
AS0458 # 07 Y:2018 07 2018 COVER OPEN TANKS $1,285 $0 Not Implemented
AS0458 # 08 Y:2018 08 2018 AIR CONDITION ONLY SPACE NECESSARY $713 $312 Not Implemented