Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
259
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1508 # 01 Y:2015 | 01 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $911 | $290 | Not Implemented |
UK1508 # 02 Y:2015 | 02 | 2015 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $14,085 | $9,000 | Not Implemented |
UK1508 # 03 Y:2015 | 03 | 2015 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $18,758 | $63,200 | Not Implemented |
UK1508 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,550 | $15,020 | Not Implemented |
UK1508 # 05 Y:2015 | 05 | 2015 | ADD AREA LIGHTING SWITCHES | $909 | $785 | Not Implemented |
UK1508 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $2,923 | $7,872 | Not Implemented |
UK1508 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,722 | $193 | Implemented |
UK1508 # 09 Y:2015 | 09 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $716 | $0 | Not Implemented |
UK1508 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,700 | $1,700 | Implemented |
UK1508 # 12 Y:2015 | 12 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,063 | $3,260 | Implemented |
UK1508 # 13 Y:2015 | 13 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,138 | $12,000 | Implemented |
UK1508 # 14 Y:2015 | 14 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,224 | $13,658 | Not Implemented |
UK1508 # 08 Y:2015 | 08 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $1,302 | $746 | Implemented |
UK1403 # 04 Y:2014 | 04 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,100 | $0 | Implemented |
UK1403 # 03 Y:2014 | 03 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,250 | $0 | Implemented |
UK1403 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,517 | $0 | Not Implemented |
UK1403 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $56,910 | $52,500 | Not Implemented |
UK1403 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $69,620 | $7,000 | Implemented |
UK1403 # 06 Y:2014 | 06 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,405 | $0 | Not Implemented |
UK1403 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $132,390 | $479,700 | Implemented |
UK1403 # 08 Y:2014 | 08 | 2014 | MINIMIZE WATER USAGE | $68,700 | $5,200 | Not Implemented |
UK1403 # 14 Y:2014 | 14 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $318,750 | $0 | Not Implemented |
UK1403 # 13 Y:2014 | 13 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $3,017 | $0 | Not Implemented |
UK1403 # 10 Y:2014 | 10 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $250,000 | $100,000 | Not Implemented |
UK1403 # 15 Y:2014 | 15 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,100 | $5,000 | Implemented |