IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1508 # 01 Y:2015 01 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $911 $290 Not Implemented
UK1508 # 02 Y:2015 02 2015 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,085 $9,000 Not Implemented
UK1508 # 03 Y:2015 03 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,758 $63,200 Not Implemented
UK1508 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,550 $15,020 Not Implemented
UK1508 # 05 Y:2015 05 2015 ADD AREA LIGHTING SWITCHES $909 $785 Not Implemented
UK1508 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $2,923 $7,872 Not Implemented
UK1508 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,722 $193 Implemented
UK1508 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $716 $0 Not Implemented
UK1508 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,700 $1,700 Implemented
UK1508 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,063 $3,260 Implemented
UK1508 # 13 Y:2015 13 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,138 $12,000 Implemented
UK1508 # 14 Y:2015 14 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,224 $13,658 Not Implemented
UK1508 # 08 Y:2015 08 2015 UPGRADE OBSOLETE EQUIPMENT $1,302 $746 Implemented
UK1403 # 04 Y:2014 04 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,100 $0 Implemented
UK1403 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,250 $0 Implemented
UK1403 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,517 $0 Not Implemented
UK1403 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $56,910 $52,500 Not Implemented
UK1403 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN WATER LINES AND VALVES $69,620 $7,000 Implemented
UK1403 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,405 $0 Not Implemented
UK1403 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,390 $479,700 Implemented
UK1403 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $68,700 $5,200 Not Implemented
UK1403 # 14 Y:2014 14 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $318,750 $0 Not Implemented
UK1403 # 13 Y:2014 13 2014 UPGRADE CONTROLS ON COMPRESSORS $3,017 $0 Not Implemented
UK1403 # 10 Y:2014 10 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $250,000 $100,000 Not Implemented
UK1403 # 15 Y:2014 15 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,100 $5,000 Implemented