IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0269 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $3,371 Implemented
IA0269 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $100,798 $400,189 n/a
IA0256 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $9,747 $11,763 Not Implemented
IA0256 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,729 $0 Not Implemented
IA0256 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $623 $2,261 Not Implemented
IA0256 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,814 $346 Not Implemented
IA0256 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,685 $100 Implemented
IA0256 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,621 $135 Implemented
IA0256 # 07 Y:2000 07 2000 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $122 $40 Implemented
IA0256 # 08 Y:2000 08 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,893 $7,910 Implemented
IA0256 # 09 Y:2000 09 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,500 $2,000 Not Implemented
IA0256 # 10 Y:2000 10 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $21,840 $12,000 Not Implemented
IA0256 # 11 Y:2000 11 2000 INSTALL AN UNINTERUPTABLE POWER SUPPLY $750 $150 Implemented
IA0227 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825,660 $1,863 n/a
IA0227 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66,200 $2,000 n/a
IA0227 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,100 $150 n/a
IA0227 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $72,026 $0 n/a
IA0227 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,875 $0 n/a
IA0227 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,254 $2,113 n/a
IA0227 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $5,561 $1,330 n/a
IA0227 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,074 $3,038 n/a
IA0227 # 09 Y:1999 09 1999 MAINTAIN MACHINES TO REDUCE LEAKS $5,867 $3,906 n/a
IA0227 # 10 Y:1999 10 1999 MAINTAIN MACHINES TO REDUCE LEAKS $2,951 $213 n/a
IA0227 # 11 Y:1999 11 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $150,880 $166,000 n/a
IA0227 # 12 Y:1999 12 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $150,880 $133,000 n/a