IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0861 # 14 Y:2012 14 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,482 $9,000 Not Implemented
UD0861 # 15 Y:2012 15 2012 ISOLATE HOT OR COLD EQUIPMENT $1,382 $1,500 Implemented
SD0454 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,512 $200 Implemented
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 03 Y:2012 03 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,156 $2,000 Not Implemented
SD0454 # 04 Y:2012 04 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,354 $2,350 Not Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
SD0454 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,826 $6,000 Not Implemented
SD0454 # 07 Y:2012 07 2012 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $28,169 $55,000 Not Implemented
SD0454 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,363 $31,050 Not Implemented
SD0454 # 09 Y:2012 09 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $148,802 $420,000 Not Implemented
SD0454 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,092 $5,992 Not Implemented
UMS010 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,000 $85,000 Not Implemented
UMS010 # 02 Y:2012 02 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $16,000 $10,000 Not Implemented
UMS010 # 03 Y:2012 03 2012 RECOVER AND REUSE COOLING WATER $10,000 $20,000 Not Implemented
IA0480 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $286 Implemented
IA0480 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,387 $5,172 Implemented
IA0480 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,272 $3,137 Implemented
IA0480 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,440 $240 Not Implemented
IA0480 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $843 $537 Not Implemented
IA0480 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,081 $6,000 Not Implemented
IA0480 # 07 Y:2012 07 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $717 $200 Not Implemented
IA0480 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $402 $557 Not Implemented
IA0480 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,810 $1,912 Implemented
UD0856 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,482 $8,415 Not Implemented