IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0734 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $300 Implemented
MA0734 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,210 Not Implemented
MA0734 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,242 $53,572 Not Implemented
MA0734 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,069 $15,975 Not Implemented
MA0734 # 03 Y:2014 03 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $2,667 $2,565 Not Implemented
MA0734 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,594 $2,614 Not Implemented
MA0604 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,518 $12,500 Not Implemented
MA0604 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $33,327 $2,600 Not Implemented
MA0604 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $3,250 $8,000 Not Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,796 $67,450 Not Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
MA0233 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,770 $2,000 Implemented
MA0233 # 02 Y:1992 02 1992 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,263 $0 Not Implemented
MA0233 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $10,672 $12,412 Implemented
MA0233 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $14,210 Implemented
MA0233 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,334 $8,000 Implemented
MA0233 # 06 Y:1992 06 1992 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $2,393 $10,000 Not Implemented
MA0233 # 07 Y:1992 07 1992 IMPROVE LUBRICATION PRACTICES $1,170 $0 Implemented
MA0227 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $4,097 $12,000 Not Implemented
MA0227 # 02 Y:1991 02 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,375 $1,566 Not Implemented
MA0227 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $974 $1,350 Not Implemented
MA0218 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $1,981 $726 Implemented
MA0218 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $753 $0 Implemented