IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0042 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $214 $1,050 Not Implemented
NL0042 # 07 Y:2019 07 2019 COMBINE UTILITY METERS $565 $1,250 Not Implemented
NL0042 # 06 Y:2019 06 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,989 $2,400 Not Implemented
NL0042 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,445 $1,600 Implemented
NL0042 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $3,805 $19,000 Not Implemented
NL0042 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,000 $800 Not Implemented
NL0042 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,309 $10,400 Implemented
NL0042 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,799 $15,889 Not Implemented
IA0563 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,138 $37,931 Implemented
IA0563 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $8,696 $7,568 Not Implemented
IA0563 # 03 Y:2016 03 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,852 $13,275 Implemented
IA0563 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,656 $560 Implemented
IA0563 # 05 Y:2016 05 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,962 $4,050 Not Implemented
IA0563 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,484 $700 Implemented
IA0563 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,182 $1,900 Implemented
IA0563 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $570 $2,800 Implemented
IA0498 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $6,316 $3,693 Not Implemented
IA0498 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,917 $9,898 Not Implemented
IA0498 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $901 $525 Implemented
IA0498 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $660 Implemented
IA0498 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $5,092 $3,443 Not Implemented
IA0480 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,081 $6,000 Not Implemented
IA0480 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $843 $537 Not Implemented
IA0480 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,440 $240 Not Implemented
IA0480 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,272 $3,137 Implemented