IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

206

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0058 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,229 $41,660 Implemented
MZ0058 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,663 $0 Not Implemented
MZ0058 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $775 $360 Not Implemented
MZ0058 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $422,776 $140,000 Implemented
MZ0058 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,916 $0 Implemented
MZ0058 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,522 $22,400 Implemented
MZ0058 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,085 $1,300 Implemented
LE0310 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,402 $7,308 Not Implemented
LE0310 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,927 $30,380 Not Implemented
LE0310 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,986 $2,500 Implemented
LE0310 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $875 $300 Not Implemented
LE0310 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,896 $4,636 Not Implemented
LE0310 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,225 $20 Implemented
LE0310 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,531 $10,000 Implemented
LE0310 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,363 $200 Implemented
LE0310 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,484 $1,420 Implemented
UM0378 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $102 $10 Not Implemented
UM0378 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $1,000 Implemented
UM0378 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,345 $7,800 Implemented
UM0378 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68,485 $2,000 Implemented
UM0378 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $2,693 $3,996 Implemented
UM0378 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,490 $31,638 Implemented
UM0378 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,599 $1,500 Implemented
TT0051 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,300 $2,800 Not Implemented
TT0051 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $30,200 $50,000 Not Implemented