IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0517 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131,032 $232,640 Implemented
UF0517 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,058 $11,918 Implemented
UF0517 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,334 $78,376 Implemented
UF0517 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,928 $0 Implemented
UF0517 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,845 $9,000 Implemented
UF0517 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $8,963 $0 Implemented
UA0193 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $70,570 $200,000 Not Implemented
UA0193 # 02 Y:2018 02 2018 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $62,836 $165,000 Not Implemented
UA0193 # 03 Y:2018 03 2018 INSTALL COMMON HEADER ON COMPRESSORS $63,989 $119,600 Not Implemented
UA0193 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,960 $1,000 Implemented
UA0193 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $6,216 $1,912 Implemented
UA0193 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,080 $25,456 Not Implemented
NL0019 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $23,000 Implemented
NL0019 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,412 $32,000 Not Implemented
NL0019 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,580 $0 Implemented
NL0019 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $5,000 $6,500 Not Implemented
UK1801 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,208 $48,400 Implemented
UK1801 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $2,773 $1,959 Implemented
UK1801 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,076 $3,990 Not Implemented
UK1801 # 04 Y:2018 04 2018 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $23,118 $11,500 Not Implemented
UK1801 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,263 $2,190 Implemented
UK1801 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $1,250 Implemented
UK1801 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $8,475 $2,977 Not Implemented
UK1801 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $3,719 $1,526 Not Implemented
UK1801 # 09 Y:2018 09 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,865 $5,895 Not Implemented