Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
888
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0209 # 07 Y:1986 | 07 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,611 | $945 | Implemented |
KU0209 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,187 | $5,000 | Implemented |
KU0209 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,209 | $3,372 | Implemented |
KU0209 # 12 Y:1986 | 12 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $809 | $0 | Implemented |
KU0209 # 13 Y:1986 | 13 | 1986 | KEEP BOILER TUBES CLEAN | $796 | $1,600 | Implemented |
KU0209 # 14 Y:1986 | 14 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $736 | $50 | Implemented |
KU0209 # 15 Y:1986 | 15 | 1986 | INSTALL TURBULATORS | $392 | $2,500 | Implemented |
KU0209 # 16 Y:1986 | 16 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $353 | $50 | Implemented |
KU0209 # 17 Y:1986 | 17 | 1986 | USE COMPRESSOR AIR FILTERS | $161 | $50 | Implemented |
KU0209 # 18 Y:1986 | 18 | 1986 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $135 | $0 | Implemented |
MA0062 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,443 | $20,000 | Implemented |
MA0062 # 04 Y:1986 | 04 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $202 | $140 | Implemented |
MA0062 # 05 Y:1986 | 05 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $446 | $30 | Implemented |
MA0049 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $721 | $500 | Implemented |
ST0033 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,963 | $0 | Implemented |
ST0033 # 03 Y:1985 | 03 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $576 | $100 | Implemented |
ST0033 # 05 Y:1985 | 05 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,080 | $1,900 | Implemented |
ST0033 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,936 | $537 | Implemented |
ST0033 # 09 Y:1985 | 09 | 1985 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $504 | $40 | Implemented |
ST0033 # 12 Y:1985 | 12 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $384 | $0 | Implemented |
MA0030 # 01 Y:1985 | 01 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,013 | $1,515 | Implemented |
MA0030 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $1,095 | $1,536 | Implemented |
MA0030 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $135 | $214 | Implemented |
MA0030 # 04 Y:1985 | 04 | 1985 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $10,416 | $8,764 | Implemented |
MA0025 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,941 | $10,097 | Implemented |