Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
137
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0413 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,124 | $500 | Implemented |
LE0413 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,559 | $14,000 | Not Implemented |
LE0413 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,404 | $15,000 | Implemented |
LE0413 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,060 | $1,800 | Not Implemented |
LE0413 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $973 | $1,000 | Implemented |
LE0413 # 07 Y:2016 | 07 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,462 | $25,000 | Implemented |
LE0413 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $1,494 | $725 | Implemented |
LE0413 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $482 | $590 | Implemented |
LE0406 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,582 | $1,000 | Implemented |
LE0406 # 05 Y:2015 | 05 | 2015 | OPTIMIZE PLANT POWER FACTOR | $4,279 | $2,920 | Not Implemented |
LE0406 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,001 | $300 | Implemented |
LE0406 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $896 | $250 | Not Implemented |
LE0406 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $6,858 | $8,310 | Implemented |
LE0406 # 07 Y:2015 | 07 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,691 | $65,000 | Implemented |
LE0406 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LE0390 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,972 | $5,400 | Not Implemented |
LE0390 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,174 | $28 | Not Implemented |
LE0390 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,489 | $1,000 | Not Implemented |
LE0390 # 10 Y:2015 | 10 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,602 | $5,200 | Not Implemented |
LE0390 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,361 | $2,457 | Not Implemented |
LE0390 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $3,974 | $7,332 | Not Implemented |
LE0390 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $398 | $75 | Not Implemented |
LE0390 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,479 | $25,500 | Implemented |
LE0390 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,333 | $5,028 | Not Implemented |
LE0390 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $558 | $120 | Not Implemented |