IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0536 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $2,367 $3,700 Not Implemented
SD0536 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,796 $2,742 Implemented
SD0536 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $200 Not Implemented
SD0536 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $1,296 $3,200 Implemented
SD0536 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,278 $1,200 Implemented
MI0296 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,090 $560 Not Implemented
MI0296 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $17,090 $208 Implemented
MI0296 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,550 $40 Implemented
MI0296 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,501 $21,680 Not Implemented
MI0296 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,548 $1,660 Implemented
MI0296 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,937 $4,464 Implemented
MI0296 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,576 $2,520 Implemented
MI0296 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,616 $2,240 Not Implemented
MI0296 # 09 Y:2016 09 2016 MINIMIZE WATER USAGE $970 $2,200 Implemented
MI0296 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $926 $40 Implemented
MI0296 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $746 $440 Implemented
MI0296 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $2,357 Not Implemented
UD0946 # 01 Y:2016 01 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,504 $500 Implemented
UD0946 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,148 $1,660 Not Implemented
UD0946 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $776 $400 Not Implemented
UD0946 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $3,057 $2,000 Not Implemented
UD0946 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $0 Implemented
UD0946 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,478 $77,725 Not Implemented
UD0946 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $462 $2,400 Implemented
UD0946 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $214 $0 Not Implemented