IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0168 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,540 $2,800 n/a
ND0168 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,188 $200 n/a
ND0168 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $283 n/a
ND0168 # 04 Y:1993 04 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $354 $450 n/a
ND0168 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $172 $46 n/a
ND0168 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $197 $350 n/a
HO0050 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,748 $2,605 Implemented
HO0050 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,764 $3,483 Implemented
HO0050 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $285 Implemented
HO0050 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $300 Implemented
HO0050 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $67 $204 Implemented
HO0050 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $40 Implemented
WV0011 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,345 $2,613 Not Implemented
WV0011 # 02 Y:1993 02 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $18,346 $6,950 Not Implemented
WV0011 # 03 Y:1993 03 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,265 $4,110 Implemented
WV0011 # 04 Y:1993 04 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $27,112 $1,450 Not Implemented
WV0011 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,421 $28,120 Implemented
WV0011 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $551 $247 Not Implemented
WV0011 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,643 $3,362 Implemented
WV0011 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,798 $12,730 Implemented
GT0495 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,270 $6,520 Not Implemented
GT0495 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $320 $500 Not Implemented
GT0495 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,080 $14,170 Implemented
GT0495 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $5,800 Not Implemented
GT0495 # 05 Y:1993 05 1993 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,390 $500 Implemented