IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0175 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $7,090 $16,000 Implemented
AM0175 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $1,000 Implemented
AM0175 # 03 Y:1993 03 1993 INSTALL TIMERS AND/OR THERMOSTATS $940 $300 Not Implemented
AM0175 # 04 Y:1993 04 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $650 $0 Implemented
AM0175 # 05 Y:1993 05 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $765 Implemented
AM0175 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $230 $540 Not Implemented
AM0175 # 07 Y:1993 07 1993 USE SYNTHETIC LUBRICANT $250 $0 Not Implemented
AM0164 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $19,440 $850 Not Implemented
AM0164 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $1,030 Implemented
AM0164 # 05 Y:1992 05 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,200 $419 Not Implemented
AM0164 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,140 $910 Implemented
AM0164 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,089 $0 Implemented
AM0164 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $44,815 $64,750 Implemented
WI0159 # 01 Y:1992 01 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,686 $1,850 Not Implemented
WI0159 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,224 $500 Implemented
WI0159 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,058 $1,431 Not Implemented
WI0159 # 04 Y:1992 04 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $498 $0 Not Implemented
WI0159 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $646 Implemented
OK0387 # 01 Y:1992 01 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,408 $1,580 Implemented
OK0387 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,003 $8,297 Not Implemented
OK0387 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $1,131 Implemented
OK0387 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,087 $1,276 Implemented
OK0387 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $832 $0 Implemented
OK0387 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $615 $2,279 Not Implemented
OK0387 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $612 $1,922 Not Implemented