IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,097

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0094 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $2,284 $1,000 Implemented
WI0094 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $975 $500 Implemented
WI0094 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $505 $0 Implemented
WI0094 # 06 Y:1990 06 1990 RECOVER WASTE HEAT FROM EQUIPMENT $489 $1,500 Not Implemented
WI0094 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $219 $800 Implemented
WI0094 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $700 Not Implemented
TN0386 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,995 $9,500 Implemented
TN0386 # 02 Y:1989 02 1989 REDESIGN PROCESS $16,823 $3,380 Not Implemented
TN0386 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,664 $0 Implemented
TN0386 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $3,860 Implemented
TN0386 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,143 $0 Not Implemented
TN0386 # 06 Y:1989 06 1989 USE OPTIMUM THICKNESS INSULATION $851 $735 Not Implemented
TN0386 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $659 $500 Implemented
OK0274 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $544 $350 Implemented
OK0274 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $6,510 $1,958 Not Implemented
OK0274 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $23,241 $3,556 Implemented
OK0274 # 04 Y:1989 04 1989 COVER OPEN TANKS $11,365 $1,986 Not Implemented
OK0274 # 05 Y:1989 05 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,511 $15,480 Not Implemented
OK0274 # 06 Y:1989 06 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,113 $1,925 Implemented
OK0274 # 07 Y:1989 07 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,496 $6,200 Not Implemented
OR0037 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,463 $0 Not Implemented
OR0037 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,466 $300 Not Implemented
OR0037 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,754 $500 Implemented
OR0037 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,296 $10,000 Implemented
OR0037 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $1,893 $2,025 Not Implemented