IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0209 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,209 $3,372 Implemented
KU0209 # 10 Y:1986 10 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,842 $8,000 Not Implemented
KU0209 # 11 Y:1986 11 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,687 $7,500 Not Implemented
KU0209 # 12 Y:1986 12 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $809 $0 Implemented
KU0209 # 13 Y:1986 13 1986 KEEP BOILER TUBES CLEAN $796 $1,600 Implemented
KU0209 # 14 Y:1986 14 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $736 $50 Implemented
KU0209 # 15 Y:1986 15 1986 INSTALL TURBULATORS $392 $2,500 Implemented
KU0209 # 16 Y:1986 16 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $353 $50 Implemented
KU0209 # 17 Y:1986 17 1986 USE COMPRESSOR AIR FILTERS $161 $50 Implemented
KU0209 # 18 Y:1986 18 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $135 $0 Implemented
MA0062 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,443 $20,000 Implemented
MA0062 # 02 Y:1986 02 1986 COVER OPEN TANKS $1,079 $605 Not Implemented
MA0062 # 03 Y:1986 03 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,903 $2,200 Not Implemented
MA0062 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $140 Implemented
MA0062 # 05 Y:1986 05 1986 REPAIR AND ELIMINATE STEAM LEAKS $446 $30 Implemented
MA0049 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $721 $500 Implemented
MA0049 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,081 $87 Not Implemented
MA0049 # 03 Y:1985 03 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,656 $40,000 Not Implemented
MA0049 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $33,063 $3,200 Not Implemented
ST0033 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $340 Not Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented
ST0033 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $853 $200 Not Implemented
ST0033 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,080 $1,900 Implemented
ST0033 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $1,488 $0 Not Implemented