IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0228 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $9,605 $2,359 Implemented
IC0228 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,679 $14,948 Implemented
IC0214 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,132 $4,600 Implemented
IC0214 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,278 $18,800 Implemented
IC0214 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,255 $68,455 Implemented
IC0214 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $23,818 $40,641 Implemented
IC0194 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,626 $220,275 Implemented
IC0194 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $87,344 $137,763 Implemented
UD0817 # 13 Y:2010 13 2010 INSULATE BARE EQUIPMENT $21,893 $0 Implemented
UD0817 # 12 Y:2010 12 2010 COVER OPEN TANKS $10,386 $0 Implemented
UD0817 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $8,137 $0 Implemented
UD0817 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $0 Implemented
UD0817 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $628 $0 Implemented
UD0817 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,672 $600 Implemented
UD0817 # 15 Y:2010 15 2010 INSULATE BARE EQUIPMENT $3,996 $0 Implemented
IC0084 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $105 $0 Implemented
IC0084 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $400 Implemented
IC0084 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,809 $585 Implemented
IC0084 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $943 $582,998 Implemented
IC0084 # 08 Y:2004 08 2004 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $48,922 $200 Implemented
IC0084 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,469 $513 Implemented
IC0084 # 10 Y:2004 10 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $794 $5,100 Implemented
IC0084 # 13 Y:2004 13 2004 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $197 $240 Implemented
IC0084 # 11 Y:2004 11 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $122 $0 Implemented
IC0077 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,807 $2,963 Implemented