IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0003 # 04 Y:2022 04 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $421 $0 Not Implemented
MU0003 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $326 $0 Not Implemented
MU0003 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $104 $0 Not Implemented
MU0003 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,452 $1,180 Not Implemented
MU0003 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $4,005 Not Implemented
MU0003 # 03 Y:2022 03 2022 PAY BILLS ON TIME TO AVOID LATE FEES $2,120 $0 Not Implemented
MU0003 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,354 $6,000 Not Implemented
MU0003 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $480 Not Implemented
UMS010 # 03 Y:2012 03 2012 RECOVER AND REUSE COOLING WATER $10,000 $20,000 Not Implemented
UMS010 # 02 Y:2012 02 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $16,000 $10,000 Not Implemented
UMS010 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,000 $85,000 Not Implemented
UM0365 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $43,773 $13,000 Implemented
UM0365 # 08 Y:2010 08 2010 INSTALL STORM WINDOWS AND DOORS $819 $0 Not Implemented
UM0365 # 07 Y:2010 07 2010 USE OPTIMUM THICKNESS INSULATION $1,040 $22,500 Implemented
UM0365 # 06 Y:2010 06 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,455 $3,500 Implemented
UM0365 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,051 $0 Implemented
UM0365 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,966 $13,000 Implemented
UM0365 # 02 Y:2010 02 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,991 $107,000 Implemented
UM0365 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,536 $77,254 Implemented
UM0194 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,736 $5,155 Not Implemented
UM0194 # 03 Y:2001 03 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $19,450 $15,600 Not Implemented
UM0194 # 05 Y:2001 05 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,925 $132,000 Not Implemented
UM0194 # 06 Y:2001 06 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,888 $4,500 Not Implemented
UM0194 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,606 $900 Not Implemented
UM0194 # 04 Y:2001 04 2001 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $90,700 $25,200 Not Implemented