IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0194 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $866,040 $200,000 Implemented
LE0194 # 02 Y:2004 02 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,658 $12,500 Implemented
LE0194 # 06 Y:2004 06 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,196 $4,000 Implemented
LE0194 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,787 $750 Implemented
LE0102 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,500 $0 Implemented
HO0069 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,140 $1,000 Implemented
RU0023 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $202 Implemented
RU0023 # 03 Y:1988 03 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,940 $0 Implemented
RU0023 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $340 $186 Implemented
RU0023 # 05 Y:1988 05 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,880 $3,250 Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented
ST0033 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,080 $1,900 Implemented
ST0033 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,936 $537 Implemented
ST0033 # 09 Y:1985 09 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $504 $40 Implemented
ST0033 # 12 Y:1985 12 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $384 $0 Implemented