Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0442 # 06 Y:2012 06 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $3,725 $10,260 Implemented
WV0442 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $1,051 $644 Implemented
WV0442 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,406 $1,900 Not Implemented
WV0442 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,141 $834 Implemented
WV0442 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $1,050 Implemented
WV0442 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,662 $4,000 Implemented
WV0442 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,772 $8,303 Not Implemented
WV0442 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,540 $24,996 Implemented
WV0442 # 03 Y:2012 03 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,204 $8,000 Not Implemented
WV0442 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,605 $46,000 Not Implemented
WV0442 # 01 Y:2012 01 2012 USE RADIANT HEATER FOR SPOT HEATING $12,851 $21,250 Not Implemented
WV0442 # 10 Y:2012 10 2012 OPTIMIZE PLANT POWER FACTOR $1,268 $6,650 Not Implemented
WV0203 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $233 $129 Not Implemented
WV0203 # 12 Y:2000 12 2000 $22,000 $4,000 Not Implemented
WV0203 # 11 Y:2000 11 2000 $6,500 $8,000 Not Implemented
WV0203 # 10 Y:2000 10 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $123,125 $120,000 Not Implemented
WV0203 # 09 Y:2000 09 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,899 $3,577 Not Implemented
WV0203 # 08 Y:2000 08 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $337 $222 Implemented
WV0203 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $45 Implemented
WV0203 # 05 Y:2000 05 2000 COVER OPEN TANKS $3,228 $1,336 Implemented
WV0203 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,914 $535 Implemented
WV0203 # 03 Y:2000 03 2000 REPAIR OR REPLACE STEAM TRAPS $735 $1,030 Implemented
WV0203 # 02 Y:2000 02 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,005 $577 Implemented
WV0203 # 01 Y:2000 01 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $355 $953 Implemented
WV0011 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,421 $28,120 Implemented