IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0049 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $721 $500 Implemented
MA0049 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,081 $87 Not Implemented
MA0049 # 03 Y:1985 03 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,656 $40,000 Not Implemented
MA0049 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $33,063 $3,200 Not Implemented
ST0033 # 12 Y:1985 12 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $384 $0 Implemented
ST0033 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,383 $87 Not Implemented
ST0033 # 10 Y:1985 10 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,126 $1,770 Not Implemented
ST0033 # 09 Y:1985 09 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $504 $40 Implemented
ST0033 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,936 $537 Implemented
ST0033 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,100 $3,100 Not Implemented
ST0033 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $1,488 $0 Not Implemented
ST0033 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,080 $1,900 Implemented
ST0033 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $853 $200 Not Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $340 Not Implemented
ST0033 # 13 Y:1985 13 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $39,416 $45,000 Not Implemented
MA0030 # 05 Y:1985 05 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,923 $15,106 Not Implemented
MA0030 # 04 Y:1985 04 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,416 $8,764 Implemented
MA0030 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $135 $214 Implemented
MA0030 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,095 $1,536 Implemented
MA0030 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,013 $1,515 Implemented
MA0025 # 03 Y:1985 03 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $8,920 $611 Not Implemented
MA0025 # 02 Y:1985 02 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,248 $1,230 Implemented
MA0025 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,941 $10,097 Implemented