Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
128
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0476 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,148 | $0 | Implemented |
WI0476 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,557 | $4,280 | Implemented |
WI0476 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $308 | $776 | Not Implemented |
WI0476 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,856 | $8,856 | Not Implemented |
WI0476 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $5,082 | $2,944 | Not Implemented |
WI0476 # 01 Y:2004 | 01 | 2004 | BURN WASTE OIL FOR HEAT | $73,937 | $36,000 | Not Implemented |
WI0476 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,807 | $21,000 | Not Implemented |
WI0476 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,141 | $640 | Implemented |
LE0194 # 03 Y:2004 | 03 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $35,941 | $5,625 | Not Implemented |
LE0194 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,915 | $2,000 | Not Implemented |
LE0194 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $866,040 | $200,000 | Implemented |
LE0194 # 02 Y:2004 | 02 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $59,658 | $12,500 | Implemented |
LE0194 # 05 Y:2004 | 05 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,360 | $2,500 | Not Implemented |
LE0194 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,196 | $4,000 | Implemented |
LE0194 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,787 | $750 | Implemented |
UD0700 # 16 Y:2004 | 16 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $588 | $500 | Implemented |
UD0700 # 11 Y:2004 | 11 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,104 | $700 | Not Implemented |
UD0700 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $4,116 | Not Implemented |
UD0700 # 14 Y:2004 | 14 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $706 | $243 | Not Implemented |
UD0700 # 10 Y:2004 | 10 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,258 | $1,405 | Not Implemented |
UD0700 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,656 | $3,000 | Not Implemented |
UD0700 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,312 | $8,302 | Not Implemented |
UD0700 # 12 Y:2004 | 12 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $850 | $328 | Not Implemented |
UD0700 # 01 Y:2004 | 01 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $454,279 | $226,320 | Not Implemented |
UD0700 # 15 Y:2004 | 15 | 2004 | INSULATE BARE EQUIPMENT | $604 | $1,575 | Not Implemented |