IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0418 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,653 $1,200 Implemented
BD0418 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $60,134 $105,100 Not Implemented
BD0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,077 $313,924 Implemented
BD0418 # 01 Y:2012 01 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $147,427 $200,000 Implemented
BD0418 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,121 $1,225 Implemented
BD0418 # 13 Y:2012 13 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,210 $1,500 Implemented
BD0418 # 15 Y:2012 15 2012 MOVE PRODUCT USING MECHANICAL MEANS $12,870 $20,000 Implemented
BD0418 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $26,689 $30,000 Not Implemented
BD0418 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $18,400 $14,100 Implemented
BD0418 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,842 $6,000 Not Implemented
BD0418 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $5,048 $12,215 Implemented
BD0418 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,441 $600 Implemented
BD0418 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,527 $500 Implemented
BD0418 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,117 $20 Implemented
BD0418 # 05 Y:2012 05 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,015 $48,000 Not Implemented
MZ0104 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,616 $30,000 Implemented
MZ0104 # 05 Y:2012 05 2012 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,111 $900 Implemented
MZ0104 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,461 $850 Not Implemented
MZ0104 # 09 Y:2012 09 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $13,645 $25,000 Not Implemented
MZ0104 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,490 $112,500 Implemented
MZ0104 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,102 $0 Not Implemented
MZ0104 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,309 $1,750 Not Implemented
MZ0104 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,398 $26,000 Implemented
MZ0104 # 08 Y:2012 08 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $152,137 $150,000 Not Implemented
MZ0104 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,299 $1,160 Not Implemented