Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0644 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $390 | $525 | Implemented |
AM0644 # 08 Y:2013 | 08 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,190 | $0 | Implemented |
AM0644 # 07 Y:2013 | 07 | 2013 | INSTALL SKYLIGHTS | $11,090 | $7,840 | Not Implemented |
AM0644 # 06 Y:2013 | 06 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $24,370 | $0 | Implemented |
AM0644 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $211,550 | $5,000 | Implemented |
AM0644 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,450 | $2,000 | Implemented |
AM0644 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,950 | $50,800 | Implemented |
AM0644 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $43,700 | $147,000 | Implemented |
AM0644 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,120 | $50 | Implemented |
UA3030 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $115,835 | $27,390 | Not Implemented |
UA3030 # 02 Y:2013 | 02 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $76,352 | $32,825 | Not Implemented |
UA3030 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $71,086 | $800 | Implemented |
UA0107 # 02 Y:2013 | 02 | 2013 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $38,831 | $7,430 | Not Implemented |
UA0107 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,182 | $17,526 | Not Implemented |
UA0107 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,548 | $48 | Not Implemented |
UA0106 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $51,514 | $100,000 | Not Implemented |
UA0106 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,770 | $91,630 | Not Implemented |
UA0106 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,561 | $600 | Not Implemented |
UA0106 # 04 Y:2013 | 04 | 2013 | USE OPTIMUM THICKNESS INSULATION | $17,964 | $9,249 | Not Implemented |
UK1312 # 02 Y:2013 | 02 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $54,717 | $520,000 | Implemented |
UK1312 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,570 | $504 | Implemented |
UK1312 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $4,473 | $3,055 | Not Implemented |
UK1312 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,264 | $5,000 | Implemented |
UK1312 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,416 | $6,400 | Not Implemented |
UK1312 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,527 | $1,376 | Implemented |