Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0355 # 07 Y:2023 | 07 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,043 | $320 | n/a |
MZ0355 # 06 Y:2023 | 06 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $29,986 | $2,880 | n/a |
MZ0355 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,922 | $78,200 | n/a |
MZ0355 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,125 | $42,980 | n/a |
MZ0355 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $860 | $750 | n/a |
MZ0355 # 02 Y:2023 | 02 | 2023 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $9,825 | $7,940 | n/a |
MZ0355 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,563 | $285,000 | n/a |
UD1065 # 06 Y:2023 | 06 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $210 | $741 | Not Implemented |
UD1065 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,334 | $3,051 | Not Implemented |
UD1065 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,980 | $2,457 | Implemented |
UD1065 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,046 | $952 | Implemented |
UD1065 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $19,345 | $19,667 | Not Implemented |
UD1065 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $38,039 | $0 | Not Implemented |
UD1065 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $589 | $0 | Not Implemented |
UD1065 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,692 | $430 | Not Implemented |
UC2309 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $155 | $494 | n/a |
UC2309 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,070 | $0 | n/a |
UC2309 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $2,261 | n/a |
UC2309 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $5,473 | $22,421 | n/a |
UC2309 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26 | $35 | n/a |
UC2309 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $666 | $1,386 | n/a |
UC2309 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $136 | $38 | n/a |
UC2309 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,846 | $33,462 | n/a |
UC2309 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,622 | $192,621 | n/a |
UL2307 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,100 | $2,693 | Implemented |