Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3312 | Blast Furnaces And Steel Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0171 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $187,954 | $165,000 | Implemented |
UM0171 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,105 | $3,600 | Not Implemented |
UM0171 # 04 Y:2000 | 04 | 2000 | USE OTHER WASTE CONCENTRATION METHODS | $147,018 | $250,000 | Not Implemented |
UM0171 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,065 | $4,430 | Not Implemented |
UM0171 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $15,476 | $30,000 | Not Implemented |
UM0171 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $717 | $3,440 | Not Implemented |
IA0256 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,729 | $0 | Not Implemented |
IA0256 # 11 Y:2000 | 11 | 2000 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $750 | $150 | Implemented |
IA0256 # 10 Y:2000 | 10 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $21,840 | $12,000 | Not Implemented |
IA0256 # 09 Y:2000 | 09 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,500 | $2,000 | Not Implemented |
IA0256 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $12,893 | $7,910 | Implemented |
IA0256 # 07 Y:2000 | 07 | 2000 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $122 | $40 | Implemented |
IA0256 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,621 | $135 | Implemented |
IA0256 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,685 | $100 | Implemented |
IA0256 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,814 | $346 | Not Implemented |
IA0256 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $623 | $2,261 | Not Implemented |
IA0256 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $9,747 | $11,763 | Not Implemented |
TN0681 # 01 Y:2000 | 01 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $32,683 | $83,500 | Implemented |
TN0681 # 02 Y:2000 | 02 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $20,000 | $16,083 | Implemented |
TN0681 # 03 Y:2000 | 03 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,200 | $23,000 | Implemented |
TN0681 # 04 Y:2000 | 04 | 2000 | DISCONNECT BALLASTS | $6,170 | $250 | Not Implemented |
TN0681 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,865 | $9,000 | Not Implemented |
TN0681 # 06 Y:2000 | 06 | 2000 | COVER OPEN TANKS | $2,400 | $1,700 | Not Implemented |