IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0035 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,034 $4,200 Implemented
LM0035 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,027 $1,395 Not Implemented
LM0035 # 08 Y:2002 08 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $135,000 $5,000 Not Implemented
LM0035 # 09 Y:2002 09 2002 DEVELOP STANDARD OPERATING PROCEDURES $103,000 $4,250 Implemented
LM0035 # 10 Y:2002 10 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $75,000 $24,500 Implemented
IC0016 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,997 $4,100 n/a
IC0016 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,313 $6,313 n/a
IC0016 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,123 $2,769 n/a
IC0016 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,259 $1,795 n/a
IC0016 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $4,304 $3,360 n/a
IC0016 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $668 $328 n/a
IC0016 # 07 Y:2001 07 2001 INSTALL SET-BACK TIMERS $2,723 $2,500 n/a
IC0016 # 08 Y:2001 08 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $76,800 $8,000 n/a
LE0120 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $43,479 $7,500 Not Implemented
LE0120 # 02 Y:2001 02 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,995 $1,000 Implemented
LE0120 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $13,290 $800 Implemented
LE0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,381 $0 Implemented
LE0120 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $2,562 $200 Implemented
LE0120 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $12,033 $18,460 Not Implemented
SF0187 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,271 $0 Implemented
SF0187 # 02 Y:2000 02 2000 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,393 $0 Implemented
SF0187 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,336 $1,446 Implemented
SF0187 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $360 $370 Implemented
SF0187 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,236 $2,040 Implemented
SF0187 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $851 $2,250 Implemented