Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
564
matching recommendationsSIC | 3315 | Steel Wire And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0296 # 13 Y:2024 | 13 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $1,011 | Implemented |
IC0296 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $5,921 | $1,066 | Implemented |
IC0296 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,898 | $23,884 | Implemented |
IC0296 # 09 Y:2024 | 09 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $62,421 | $0 | Implemented |
IC0296 # 07 Y:2024 | 07 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $465,211 | $3,649,800 | Not Implemented |
IC0296 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,196 | $12,921 | Not Implemented |
IC0296 # 10 Y:2024 | 10 | 2024 | REPLACE BOILER | $112,681 | $127,793 | Not Implemented |
IC0296 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,324 | $400 | Implemented |
IC0296 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,777 | $8,406 | Implemented |
IC0296 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,022 | $1,150 | Implemented |
IC0296 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $2,446 | $608 | Implemented |
IC0296 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $271,456 | $1,202,972 | Not Implemented |
IC0296 # 05 Y:2024 | 05 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,015 | $9,479 | Not Implemented |
MZ0355 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,125 | $42,980 | Not Implemented |
MZ0355 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $860 | $750 | Not Implemented |
MZ0355 # 06 Y:2023 | 06 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $29,986 | $2,880 | Not Implemented |
MZ0355 # 07 Y:2023 | 07 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,043 | $320 | Implemented |
MZ0355 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,563 | $285,000 | Not Implemented |
MZ0355 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,922 | $78,200 | Not Implemented |
MZ0355 # 02 Y:2023 | 02 | 2023 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $9,825 | $7,940 | Not Implemented |
UC2309 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26 | $35 | Not Implemented |
UC2309 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $5,473 | $22,421 | Not Implemented |
UC2309 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $2,261 | Implemented |
UC2309 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $155 | $494 | Not Implemented |
UC2309 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,070 | $0 | Implemented |