IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 Not Implemented
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 Not Implemented
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
UD1065 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $589 $0 Not Implemented
UD1065 # 06 Y:2023 06 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $210 $741 Not Implemented
UD1065 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,334 $3,051 Not Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 Not Implemented
WM0197 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,111 $870 Implemented
WM0197 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,789 $1,875 Implemented
WM0197 # 02 Y:2023 02 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,068 $1,938 Not Implemented
WM0197 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,680 $41,043 Implemented
WM0197 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,841 $1,700 Not Implemented
WM0197 # 03 Y:2023 03 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,776 $3,225 Not Implemented
LT8364 # 01 Y:2023 01 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $54,602 $0 n/a
LT8364 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,106 $26,500 n/a
LT8364 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,257 $9,840 n/a
MS0404 # 03 Y:2022 03 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $853 $525 Not Implemented
MS0404 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $176,387 $1,148,430 Not Implemented
MS0404 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $9,805 $22,420 Not Implemented
MS0404 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $14,973 $3,790 Not Implemented
AM0829 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $7,640 $15,900 Implemented
AM0829 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $35,850 $3,600 Implemented
AM0829 # 02 Y:2021 02 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,580 $5,720 Implemented
OK1014 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,017 $1,750 Implemented