IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0154 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $1,548 Not Implemented
UL0154 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $160 $3,080 Not Implemented
UL0154 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $202 $20 Not Implemented
UL0154 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $35 Not Implemented
UL0154 # 05 Y:1996 05 1996 REDUCE OR ELIMINATE WASTE $7,500 $900 Not Implemented
UL0154 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,040 $500 Not Implemented
UL0154 # 07 Y:1996 07 1996 USE LESS WASTEFUL PACKAGING $26,750 $36,000 Not Implemented
AR0058 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,641 $4,433 Implemented
AR0058 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,114 $150 Implemented
AR0058 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,949 $6,510 Implemented
AR0058 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,109 $0 Implemented
AR0058 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $4,705 $14,960 Not Implemented
AR0058 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,459 $1,000 Implemented
AM0245 # 01 Y:1995 01 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,880 $69,400 Not Implemented
AM0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,630 $0 Not Implemented
AM0245 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $800 Implemented
AM0245 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $1,680 $0 Not Implemented
AM0245 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $690 Not Implemented
AM0245 # 06 Y:1995 06 1995 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $7,450 $7,900 Implemented
AM0245 # 07 Y:1995 07 1995 USE A RAG RECYCLE SERVICE $2,000 $0 Implemented
AM0245 # 08 Y:1995 08 1995 CONVERT TO AQUEOUS CLEANING SYSTEM $1,060 $3,600 Implemented
AM0245 # 09 Y:1995 09 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $560 $0 Implemented
AM0245 # 10 Y:1995 10 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 Implemented
AM0238 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $178,800 $0 Not Implemented
AM0238 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $7,140 $6,200 Not Implemented