Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
568
matching recommendationsSIC | 3317 | Steel Pipe And Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0104 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,616 | $30,000 | Implemented |
MZ0104 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,111 | $900 | Implemented |
MZ0104 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,299 | $1,160 | Not Implemented |
MZ0104 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,461 | $850 | Not Implemented |
MZ0104 # 08 Y:2012 | 08 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $152,137 | $150,000 | Not Implemented |
MZ0104 # 09 Y:2012 | 09 | 2012 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $13,645 | $25,000 | Not Implemented |
MZ0104 # 10 Y:2012 | 10 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,490 | $112,500 | Implemented |
WV0442 # 01 Y:2012 | 01 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $12,851 | $21,250 | Not Implemented |
WV0442 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,605 | $46,000 | Not Implemented |
WV0442 # 03 Y:2012 | 03 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,204 | $8,000 | Not Implemented |
WV0442 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,540 | $24,996 | Implemented |
WV0442 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,141 | $834 | Implemented |
WV0442 # 06 Y:2012 | 06 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,725 | $10,260 | Implemented |
WV0442 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,772 | $8,303 | Not Implemented |
WV0442 # 08 Y:2012 | 08 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,662 | $4,000 | Implemented |
WV0442 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,406 | $1,900 | Not Implemented |
WV0442 # 10 Y:2012 | 10 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,268 | $6,650 | Not Implemented |
WV0442 # 11 Y:2012 | 11 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $1,051 | $644 | Implemented |
WV0442 # 12 Y:2012 | 12 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $1,050 | Implemented |
UA0072 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,176 | $2,039 | Implemented |
UA0072 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,742 | $3,900 | Implemented |
UA0072 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,647 | $80 | Implemented |
UA0072 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $6,856 | $7,937 | Not Implemented |
UA0072 # 05 Y:2012 | 05 | 2012 | USE PHOTOCELL CONTROLS | $1,851 | $1,030 | Not Implemented |
UA0072 # 06 Y:2012 | 06 | 2012 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $3,939 | $9,445 | Not Implemented |