Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,149
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0282 # 02 Y:2025 | 02 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $21,900 | $12,000 | n/a |
UU0282 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $790 | $5,550 | n/a |
UU0282 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,520 | $9,240 | n/a |
UU0282 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $3,030 | $15,460 | n/a |
UU0282 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $11,100 | $4,800 | n/a |
UU0282 # 04 Y:2025 | 04 | 2025 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,300 | $2,900 | n/a |
UU0282 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,350 | $3,000 | n/a |
UU0282 # 09 Y:2025 | 09 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $1,130 | $2,230 | n/a |
UU0282 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,800 | $9,600 | n/a |
UU0282 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,270 | $22,800 | n/a |
IP0214 # 01 Y:2025 | 01 | 2025 | CONVERT TO ELECTROSTATIC POWDER COATING | $114,298 | $0 | n/a |
IP0214 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $562,500 | $561,997 | n/a |
IP0214 # 08 Y:2025 | 08 | 2025 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $9,428 | $9,599 | n/a |
IP0214 # 11 Y:2025 | 11 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $3,485 | n/a |
IP0214 # 14 Y:2025 | 14 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,911 | $51,915 | n/a |
IP0214 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,561 | $243 | n/a |
IP0214 # 10 Y:2025 | 10 | 2025 | UPGRADE CONVEYORS | $4,792 | $7,500 | n/a |
IP0214 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,935 | $2,485 | n/a |
IP0214 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,932 | $646 | n/a |
IP0214 # 12 Y:2025 | 12 | 2025 | STANDARDIZE MOTOR INVENTORY | $23,673 | $53,888 | n/a |
IP0214 # 09 Y:2025 | 09 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $9,756 | $12,559 | n/a |
IP0214 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,034 | $3,500 | n/a |
IP0214 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $29,619 | $95,000 | n/a |
IP0214 # 02 Y:2025 | 02 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $2,655 | $0 | n/a |
OK1142 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,157 | $2,317 | n/a |