IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0332 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $2,665 Implemented
AM0332 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $830 $100 Not Implemented
AM0332 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $775 $1,200 Implemented
AM0332 # 07 Y:1998 07 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $460 $0 Implemented
AM0332 # 08 Y:1998 08 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $380 $0 Implemented
AM0332 # 09 Y:1998 09 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $380 $0 Implemented
AM0332 # 10 Y:1998 10 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $350 $20 Implemented
KG0089 # 01 Y:1997 01 1997 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $39,149 $0 n/a
KG0089 # 02 Y:1997 02 1997 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,852 $790 n/a
KG0089 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,955 $3,380 n/a
KG0089 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $4,400 $0 n/a
KG0089 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,294 $422 n/a
KG0089 # 06 Y:1997 06 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,006 $600 n/a
KG0089 # 07 Y:1997 07 1997 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $4,062 $7,900 n/a
KG0089 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $550 $300 n/a
KG0089 # 09 Y:1997 09 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $258 $0 n/a
KG0089 # 10 Y:1997 10 1997 MOVE PRODUCT USING MECHANICAL MEANS $27,325 $1,612 n/a
KG0064 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,652 $12,200 Implemented
KG0064 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,970 $3,560 Not Implemented
KG0064 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $343 Implemented
KG0064 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $20 Not Implemented
KG0064 # 05 Y:1996 05 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $1,283 $651 Not Implemented
AM0253 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $35,300 $92,500 Implemented
AM0253 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,500 $3,000 Implemented
AM0253 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,250 $1,000 Implemented