Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0664 # 15 Y:2003 15 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $178 $0 Implemented
UD0664 # 16 Y:2003 16 2003 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $112 $0 Not Implemented
OK0657 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $1,116 $722 Not Implemented
OK0657 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,220 $25 Implemented
OK0657 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,257 $320 Implemented
OK0657 # 04 Y:2003 04 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $16,000 $0 Not Implemented
OK0657 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,814 $11,574 Not Implemented
OK0657 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $3,894 $3,430 Not Implemented
OK0657 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,378 $7,500 Not Implemented
OK0657 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,624 $11,750 Implemented
OK0657 # 09 Y:2003 09 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $624,000 $10,149 Not Implemented
IA0312 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,964 $779 Not Implemented
IA0312 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $25 Not Implemented
IA0312 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $58,932 $136,000 Not Implemented
IA0312 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $0 Implemented
IA0312 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,976 $8,950 Implemented
IA0312 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $677 $2,261 Implemented
IA0312 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,748 $1,356 Implemented
WI0437 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $72,831 $56,000 Not Implemented
WI0437 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,938 $72,500 Not Implemented
WI0437 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $17,126 $3,000 Not Implemented
WI0437 # 04 Y:2003 04 2003 INSTALL AUTOMATIC STACK DAMPER $16,313 $1,500 Not Implemented
WI0437 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,938 $8,555 Not Implemented
BD0227 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,980 $3,000 Not Implemented
BD0227 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,495 $0 Implemented