Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,069
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0664 # 15 Y:2003 | 15 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $178 | $0 | Implemented |
UD0664 # 16 Y:2003 | 16 | 2003 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $112 | $0 | Not Implemented |
OK0657 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $1,116 | $722 | Not Implemented |
OK0657 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,220 | $25 | Implemented |
OK0657 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,257 | $320 | Implemented |
OK0657 # 04 Y:2003 | 04 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $16,000 | $0 | Not Implemented |
OK0657 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,814 | $11,574 | Not Implemented |
OK0657 # 06 Y:2003 | 06 | 2003 | USE OPTIMUM THICKNESS INSULATION | $3,894 | $3,430 | Not Implemented |
OK0657 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,378 | $7,500 | Not Implemented |
OK0657 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,624 | $11,750 | Implemented |
OK0657 # 09 Y:2003 | 09 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $624,000 | $10,149 | Not Implemented |
IA0312 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,964 | $779 | Not Implemented |
IA0312 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,291 | $25 | Not Implemented |
IA0312 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $58,932 | $136,000 | Not Implemented |
IA0312 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,061 | $0 | Implemented |
IA0312 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,976 | $8,950 | Implemented |
IA0312 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $677 | $2,261 | Implemented |
IA0312 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,748 | $1,356 | Implemented |
WI0437 # 01 Y:2003 | 01 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $72,831 | $56,000 | Not Implemented |
WI0437 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,938 | $72,500 | Not Implemented |
WI0437 # 03 Y:2003 | 03 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $17,126 | $3,000 | Not Implemented |
WI0437 # 04 Y:2003 | 04 | 2003 | INSTALL AUTOMATIC STACK DAMPER | $16,313 | $1,500 | Not Implemented |
WI0437 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,938 | $8,555 | Not Implemented |
BD0227 # 01 Y:2003 | 01 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,980 | $3,000 | Not Implemented |
BD0227 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,495 | $0 | Implemented |