IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0116 # 05 Y:2001 05 2001 USE LESS WASTEFUL PACKAGING $11,666 $0 Not Implemented
LE0116 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $40 Implemented
LE0105 # 01 Y:2001 01 2001 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,453 $245 Not Implemented
LE0105 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $674 $0 Not Implemented
LE0105 # 03 Y:2001 03 2001 BURN A LESS EXPENSIVE GRADE OF FUEL $301 $0 Not Implemented
LE0105 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,872 $850 Not Implemented
LE0105 # 05 Y:2001 05 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,880 $1,200 Not Implemented
HO0222 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $8,392 Implemented
HO0222 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,554 $21,600 Not Implemented
HO0222 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $697 $600 Implemented
HO0222 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $14,666 $0 Not Implemented
HO0222 # 05 Y:2000 05 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $723 $4,000 Implemented
HO0222 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,014 $2,700 Not Implemented
HO0222 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $7,500 $5,000 Not Implemented
HO0222 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $4,000 Implemented
HO0222 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $5,475 $500 Implemented
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
HO0174 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $2,308 Not Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,561 $7,680 Not Implemented
HO0174 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,800 $8,000 Not Implemented
HO0174 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $24,960 $5,000 Not Implemented
HO0174 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $0 Not Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented