IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

137

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0222 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,014 $2,700 Not Implemented
HO0222 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $7,500 $5,000 Not Implemented
HO0222 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $4,000 Implemented
HO0222 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $5,475 $500 Implemented
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
HO0174 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $2,308 Not Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,561 $7,680 Not Implemented
HO0174 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,800 $8,000 Not Implemented
HO0174 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $24,960 $5,000 Not Implemented
HO0174 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $0 Not Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented
WV0123 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $127 Implemented
WV0123 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,494 $27,687 Implemented
WV0123 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,827 $920 Implemented
WV0123 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,460 $280 Not Implemented
WV0123 # 05 Y:1997 05 1997 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,572 $1,500 Not Implemented
WV0123 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,050 $910 Not Implemented
WV0123 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $32,948 $910 Implemented
WV0123 # 08 Y:1997 08 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $21,126 $43,250 Not Implemented
WV0123 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,837 $9,000 Not Implemented
WV0123 # 10 Y:1997 10 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $915 $5,000 Not Implemented
WV0123 # 11 Y:1997 11 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $920,000 $1,507,800 Not Implemented
WV0121 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $420 Implemented