Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,108
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0593 # 02 Y:2000 | 02 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $42,268 | $45,000 | Implemented |
UD0593 # 03 Y:2000 | 03 | 2000 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $36,834 | $55,945 | Not Implemented |
UD0593 # 04 Y:2000 | 04 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,243 | $6,080 | Implemented |
UD0593 # 05 Y:2000 | 05 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,710 | $0 | Not Implemented |
HO0222 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,727 | $8,392 | Implemented |
HO0222 # 02 Y:2000 | 02 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,554 | $21,600 | Not Implemented |
HO0222 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $697 | $600 | Implemented |
HO0222 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $14,666 | $0 | Not Implemented |
HO0222 # 05 Y:2000 | 05 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $723 | $4,000 | Implemented |
HO0222 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,014 | $2,700 | Not Implemented |
HO0222 # 07 Y:2000 | 07 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $7,500 | $5,000 | Not Implemented |
HO0222 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $30,000 | $4,000 | Implemented |
HO0222 # 09 Y:2000 | 09 | 2000 | RECYCLE CASTING SAND | $5,475 | $500 | Implemented |
HO0222 # 10 Y:2000 | 10 | 2000 | METER WASTE WATER | $902 | $0 | Implemented |
IA0227 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $825,660 | $1,863 | n/a |
IA0227 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $66,200 | $2,000 | n/a |
IA0227 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,100 | $150 | n/a |
IA0227 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $72,026 | $0 | n/a |
IA0227 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,875 | $0 | n/a |
IA0227 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,254 | $2,113 | n/a |
IA0227 # 07 Y:1999 | 07 | 1999 | INSTALL OCCUPANCY SENSORS | $5,561 | $1,330 | n/a |
IA0227 # 08 Y:1999 | 08 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,074 | $3,038 | n/a |
IA0227 # 09 Y:1999 | 09 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $5,867 | $3,906 | n/a |
IA0227 # 10 Y:1999 | 10 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $2,951 | $213 | n/a |
IA0227 # 11 Y:1999 | 11 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,880 | $166,000 | n/a |