Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0224 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,978 | $2,200 | Implemented |
MZ0224 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,705 | $1,263 | Implemented |
MZ0224 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $355 | $300 | Not Implemented |
MZ0224 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $474 | $663 | Implemented |
MZ0224 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $305 | $700 | Not Implemented |
MZ0111 # 04 Y:2013 | 04 | 2013 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $514 | $80 | Not Implemented |
MZ0111 # 05 Y:2013 | 05 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,873 | $900 | Implemented |
MZ0111 # 02 Y:2013 | 02 | 2013 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,032 | $2,500 | Not Implemented |
MZ0111 # 03 Y:2013 | 03 | 2013 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $283 | $680 | Implemented |
MZ0111 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $460 | $0 | Not Implemented |
MZ0046 # 07 Y:2009 | 07 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $205,683 | $30,000 | Not Implemented |
MZ0046 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,631 | $54,630 | Implemented |
MZ0046 # 09 Y:2009 | 09 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $10,100 | $8,000 | Implemented |
MZ0046 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,025 | $14,100 | Implemented |
MZ0046 # 06 Y:2009 | 06 | 2009 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,620 | $1,800 | Implemented |
MZ0046 # 08 Y:2009 | 08 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,483 | $0 | Implemented |
MZ0046 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $18,406 | $1,380 | Implemented |
MZ0046 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,771 | $0 | Implemented |
MZ0046 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,749 | $1,300 | Implemented |
KU0378 # 07 Y:1992 | 07 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $669 | $5,923 | Not Implemented |
KU0378 # 08 Y:1992 | 08 | 1992 | IMPROVE LUBRICATION PRACTICES | $3,215 | $0 | Not Implemented |
KU0378 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,100 | $400 | Implemented |
KU0378 # 05 Y:1992 | 05 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,407 | $250 | Not Implemented |
KU0378 # 04 Y:1992 | 04 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,739 | $720 | Implemented |
KU0378 # 03 Y:1992 | 03 | 1992 | OPTIMIZE PLANT POWER FACTOR | $10,253 | $6,000 | Not Implemented |