Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
90
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0227 # 09 Y:1999 | 09 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $5,867 | $3,906 | n/a |
IA0227 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $825,660 | $1,863 | n/a |
IA0227 # 15 Y:1999 | 15 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,440 | $146,000 | n/a |
IA0227 # 16 Y:1999 | 16 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,440 | $150,000 | n/a |
IA0227 # 13 Y:1999 | 13 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,880 | $136,000 | n/a |
IA0227 # 14 Y:1999 | 14 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,880 | $154,000 | n/a |
IA0227 # 11 Y:1999 | 11 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,880 | $166,000 | n/a |
IA0227 # 12 Y:1999 | 12 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $150,880 | $133,000 | n/a |
IA0227 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $72,026 | $0 | n/a |
IA0227 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,254 | $2,113 | n/a |
IA0227 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,875 | $0 | n/a |
IA0227 # 10 Y:1999 | 10 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $2,951 | $213 | n/a |
IA0227 # 08 Y:1999 | 08 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,074 | $3,038 | n/a |
IA0227 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,100 | $150 | n/a |
IA0227 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $66,200 | $2,000 | n/a |
IA0227 # 07 Y:1999 | 07 | 1999 | INSTALL OCCUPANCY SENSORS | $5,561 | $1,330 | n/a |
ND0328 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $293 | $350 | Not Implemented |
ND0328 # 10 Y:1999 | 10 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $120 | $75 | Implemented |
ND0328 # 08 Y:1999 | 08 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $285 | $0 | Implemented |
ND0328 # 06 Y:1999 | 06 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $748 | $250 | Implemented |
ND0328 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $892 | $200 | Not Implemented |
ND0328 # 04 Y:1999 | 04 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $912 | $950 | Implemented |
ND0328 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,212 | $7,590 | Implemented |
ND0328 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $8,575 | $1,100 | Not Implemented |
ND0328 # 01 Y:1999 | 01 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $12,717 | $27,395 | Implemented |